Block Island Wind Farm and Block Island Transmission System Environmental Report (ER)/Construction and Operations Plan (COP)- Appendix E-3 BIWF Geotechnical Report

Source/Sponsor: 
Deepwater Wind
Creator/Author: 
GZA GeoEnvironmental, Inc.
Description: 

Appendix E-3 contains a geotechnical subsurface investigation and analysis for the proposed Block Island Wind Farm.  It also provides recommended geotechnical design parameters for use by the structural engineer and design team.

 
pdf
Publication Date: 
Thursday, September 27, 2012
29 MB
Resource Type: 
Document
State: