Block Island Wind Farm and Block Island Transmission System Environmental Report (ER)/Construction and Operations Plan (COP)- Appendix H-2 Sediment Transport Supplemental Analysis of Nearshore Cable Installation

Source/Sponsor: 
Deepwater Wind
Creator/Author: 
Tetra Tech EC; RPS ASA
Description: 

Appendix H-2 contains a supplemental sediment transport analysis that evaluates impacts of an additional 1,500 foot jet plow track at Crescent Beach on Block Island and Narrangansett Town Beach on the mainland. 

 
pdf
Publication Date: 
Thursday, September 27, 2012
2 MB
Resource Type: 
Document
State: