Block Island Wind Farm and Block Island Transmission System Environmental Report (ER)/Construction and Operations Plan (COP)- Appendix I Draft Storm Water Pollution Prevention Plan

Source/Sponsor: 
Deepwater Wind
Creator/Author: 
DiPrete Engineering
Description: 

Appendix I contains a draft stormwater prevention plan that details the measures to be taken during construction to prevent stormwater pollution from leaving the Block Island substation and Narragansett or Bonnet switchyards.

 
pdf
Publication Date: 
Thursday, September 27, 2012
506 KB
Resource Type: 
Document
State: