Block Island Wind Farm and Block Island Transmission System Environmental Report (ER)/Construction and Operations Plan (COP)- Appendix U Navigational Risk Assessment

Source/Sponsor: 
Deepwater Wind
Creator/Author: 
Tetra Tech EC
Description: 

Appendix U contains a navigational risk assessment of potential risks to navigation safety as a result of the construction, installation, operation, and placement of the Block Island Wind Farm and Block Island Transmission System.

 
pdf
Publication Date: 
Thursday, September 27, 2012
7 MB
Resource Type: 
Document
State: